Capital Project Deliverables Compendium™
A structured training system that walks project managers through every required capital project deliverable, with practical guidance and templates to support consistent, high-quality project execution.
The Capital Project Deliverables Compendium™ is a Concord® Training System designed to standardize how capital projects are planned, defined, executed, and closed.
This course provides a complete, stage-by-stage overview of all required deliverables across the capital project lifecycle, supported by clear instructions, context, and practical templates that project managers can apply immediately.
Built for both new and developing project managers, the system offers a structured reference that clarifies what must be produced at each gate, how deliverables integrate, and how consistent documentation improves safety, quality, cost control, and execution readiness.
The Compendium reflects real owner and EPC practices and is aligned with established project management processes, stage-gated governance, and field-driven execution requirements.
Learners will gain a repeatable approach to project delivery that strengthens decision-making, reduces ambiguity, and supports reliable performance across engineering, procurement, construction, commissioning, and closeout.
This course is intended to serve as a foundational standard for capital project professionals and as a long-term reference for day-to-day work.
Purpose of This Training
How to Use This Training
Scope
Usage Rules
Copyright Notice
Deliverable 1.1: Project Premise – Initial Version
Deliverable 1.2: Options Identification & Screening Matrix
Deliverable 1.3: High-Level Scope Definition
Deliverable 1.4: Preliminary Cost Estimate (ROM: −20% / +100%)
Deliverable 1.5: Preliminary Schedule (Milestone-Level)
Deliverable 1.6: Initial Risk Register (FEL-2A version)
Deliverable 1.7: Stakeholder Map / Engagement Summary
Deliverable 1.8: Environmental & Permitting Screening
Deliverable 1.9: Early Construction & AWP Alignment Summary — FEL-2A
Deliverable 1.10: FEL-2A Decision Support Package (DSP)
Deliverable 2.1: Updated & Frozen Project Premise (Final FEL-2 Version)
Deliverable 2.2: Final Option Selection & Concept Basis (One Recommended Concept)
Deliverable 2.3: Initial Basis of Design (BOD) – FEL-2 Version
Deliverable 2.4: Value Improvement Practices (VIP) Summary (Completed/Screened)
Deliverable 2.5: FEL-2B Cost Estimate (−15% / +30%) + Basis of Estimate
Deliverable 2.6: FEL-2B Schedule (Level 2) + Schedule Basis
Deliverable 2.7: Procurement & Contracting Strategy (FEL-2B Edition)
Deliverable 2.8: Updated Risk Register (FEL-2B)
Deliverable 2.9: Construction Work Areas (CWAs) – Updated & Approved
Deliverable 2.10: Path of Construction (PoC) – FEL-2B Version
Deliverable 3.1: Final Basis of Design (BOD)
Deliverable 3.2: PFDs – Issued for Design / Acceptance
Deliverable 3.3: P&IDs – Issued for Design (IFD)
Deliverable 3.4: HAZOP Report + Action List
Deliverable 3.5: Discipline Design Deliverables List/ EWP List (Frozen Scope)
Deliverable 3.6: Path of Construction (PoC) – FEL-3 Structured Version
Deliverable 3.7: Procurement & Contracting Plan (Final)
Deliverable 3.9: Definitive Cost Estimate (±10%) + Basis of Estimate (BoE)
Deliverable 3.10: Level-3 Schedule + EWP/CWP Release Plans + Schedule Basis
Deliverable 3.11: Project Execution Plan (PEP)
Deliverable 3.12: The FID Package Readiness Checklist
Deliverable 4.1: Interface Management Register/ RACI Matrix Update
Deliverable 4.2: Change Management Log (Engineering & Procurement)
Deliverable 4.3: EWP/CWP Release Plans (AWP-Aligned - Updated) + Level 4 schedule updates
Deliverable 4.4: Model Review (3D Model) – Coordination Reviews
Deliverable 4.5: Procurement Status Report (PSR) / Expediting Log (PWP Aligned)
Deliverable 4.6: EWPs/ IFC Drawing Set (Issued for Construction) – All Disciplines
Deliverable 4.7: IFC Specifications, BOM & Procurement Package
Deliverable 4.8: Vendor Data Requirements & Tracking Log per PWP (SDRL / VDRL)
Deliverable 4.9: Purchase Orders (POs) — Issued & Executed / Mapped to PWPs
Deliverable 4.10: Technical Query (TQ) / Engineering Change Log
Deliverable 4.11: Final Construction Work Packages (CWPs) – IFC-Aligned
Deliverable 4.12: Updated Cost & Schedule Forecast
Deliverable 4.13: Construction Execution Plan (CEP)
Deliverable 5.1: Field Readiness / Construction Readiness Review (CRR)
Deliverable 5.2: Installation Work Package (IWP) Release Plan
Deliverable 5.3: Individual IWPs (Issued for Installation)
Deliverable 5.4: Construction Constraint Log
Deliverable 5.5: Field Progress Measurement (Rules of Credit Applied)
Deliverable 5.6: Construction Daily/Weekly Reports
Deliverable 5.7: RFI / Technical Query (TQ) Log – Construction Version
Deliverable 5.8: Quality Records Package (Inspection & Test Plans, Check Sheets)
Deliverable 5.9: Updated Construction Schedule (IWP/CWP-Integrated)
Deliverable 5.10 : Workface Planning Minimum Requirements
Deliverable 5.11: Executed Construction Contract Packages
Deliverable 5.12: Contract Change Log (Construction Commercial Register)
Deliverable 6.1: System Turnover Packages (STPs)
Deliverable 6.2: Commissioning Package
Deliverable 6.3: System-by-System Startup Plan
Deliverable 6.4: Operations Readiness & Handover Package
Deliverable 7.1 Project Closeout Report
Deliverable 7.2: Final Cost Report / Final Forecast
Deliverable 7.3: Final Schedule (As-Built) + Variance Analysis
Deliverable 7.4: Lessons Learned Register (Final Version)
Deliverable 7.5: Document Archival Index / Turnover of Final Documentation
Deliverable 7.6: Final Handover to Operations / Maintenance Certificate
FEL Checklist Review
AWP Checklist Review
PDRI Review
Standardized Project Meetings
Course Completion Notice
Using This Compendium in Your Projects
Taking the Concord® Capital Project Manager Certification Exam
Recordkeeping & Compliance
Continued Learning & Reference
Support & Contact
It is a Concord® Training System that provides a complete, stage-by-stage set of required deliverables for capital projects, supported by instructions, context, and practical templates.
Project managers, project directors, project engineers, construction coordinators, and professionals entering or advancing within capital project delivery roles.
Enrollment includes 12 months of access to all modules, templates, deliverables, and updates.
Yes. The course includes downloadable, ready-to-use templates for key deliverables across the entire capital project lifecycle.
Yes. The Compendium serves as foundational knowledge for the Concord® Capital Project Manager Certification Exam.
Yes. All modules and materials are available on-demand so you can proceed at your own pace.
Yes. Enterprise access and multi-seat licenses are available upon request at [email protected]
No. The course is structured to support both new and developing project managers, as well as experienced professionals seeking greater structure and consistency.
Yes. The Compendium is fully compatible with PMBOK®, CII best practices, and IPA’s stage-gate and FEL principles. However, it provides a more standardized and comprehensive deliverables system, built on real Owner-side project requirements and practical field experience. It translates high-level methodologies into the actual documents, templates, and lifecycle controls needed to deliver successful capital projects.